Base
Faygate
and Colgate. Firm level area to be provided by customer
Rusper and Capel. Level base of crushed concrete or similar to be provided by customer

Floor
Vegetation mat laid over whole site
Polythene DPM laid under sleepers
Ex 250 x 125 pressure impregnated sleepers to form sleeper walls
Galvanised vermin exclusion mesh fitted across ventilation gaps
Pretreated joists ring beams and blockings to form suspended floor
100 mm polystyrene insulation
Chipboard flooring

Walls
89 x 38 base and top plate
89 x 38 CLS studs and rails
9mm sheathing ply
YBS breather foil insulating & fire-resistant membrane
Ex 50 x 25 vertical battens
Ex 150 x 25 feather edge cladding
100mm insulation

Roof
Cut and pitch barn hip structure
19 mm OSB sarking
180 mm Insulation
Asphalt shingles in green or red
Fascias and soffits in ply
Black plastic guttering and down pipes
Customer to supply suitable water butts

Electrics
All cabling terminating to a fusebox with external access for connection by an electrician

Toilet connection
The soil pipe will terminate on the outside of the building for connecting by a builder

Water connection
A connection pipe connected to an internal stop cock will be provided for connection by a plumber

Note:

Our specification is extremely good. If you require any explanation, please let us know and all will be explained!