Specifications
Base
Faygate and
Colgate.
Firm level area to be provided by customer
Rusper
and Capel.
Level base of crushed concrete or similar to be provided by customer
Floor
Vegetation mat laid over whole site
Polythene DPM laid under sleepers
Ex 250 x 125 pressure impregnated sleepers to form sleeper walls
Galvanised vermin exclusion mesh fitted across ventilation gaps
Pretreated joists ring beams and blockings to form suspended floor
100 mm polystyrene insulation
Chipboard flooring
Walls
89 x 38 base and top plate
89 x 38 CLS studs and rails
9mm sheathing ply
YBS breather foil insulating & fire-resistant membrane
Ex 50 x 25 vertical battens
Ex 150 x 25 feather edge cladding
100mm insulation
Roof
Cut and pitch barn hip structure
19 mm OSB sarking
180 mm Insulation
Asphalt shingles in green or red
Fascias and soffits in ply
Black plastic guttering and down pipes
Customer to supply suitable water butts
Electrics
All cabling terminating to a fusebox with external access for connection
by an electrician
Toilet connection
The soil pipe will terminate on the outside of the building for
connecting by a builder
Water connection
A connection pipe connected to an internal stop cock will be provided
for connection by a plumber
Note:
Our specification is extremely good. If
you require any explanation, please let us know and all will be
explained!