Day 1: Step by Step Build of our Largest Garden Building yet

Chris & Cliff prepare to load up sections of our biggest ever garden buildingĀ (just over 700sq ft) to take to Sheffield:

day-1-big-garden-building

 

The client has already laid the concrete base. Here’s a photo of the Ground plates going down:

day-1-big-garden-building2

 

Next Chris starts to lay down the insulated floor panels.

day-1-big-garden-building3

Last job of the day, Roy and Chris start firing down the floor. At least this job’s in the shade! :)

day-1-big-garden-building4